"Does this building have an OC?" has become one of the first questions home buyers in Mulund and Vikhroli ask, and for good reason. On 12 October 2026, Maharashtra's revenue department issued a circular telling sub-registrars not to register flat sale and transfer documents unless the required approvals are attached, and to refuse registration where the flat area is more than the sanctioned plan (Lokmat Times, Times of India). At the same time, the BMC has opened an OC amnesty scheme for older housing societies. This guide explains what an occupancy certificate is, why it matters, and how to check it before you pay.
An occupancy certificate (also called an occupation certificate) is issued by the local planning authority, which in Mumbai is usually the BMC, once a building is complete. MahaRERA describes it as the certificate that signifies the construction of the project is completed in compliance with the approved plan and building laws (MahaRERA, possession stage). Without it, the building is not cleared for people to live in.
In Mumbai, CC means Commencement Certificate: permission to start building, often given floor by floor. The OC comes at the end, after inspection. A project can have a valid CC and still have no OC. A part OC covers only the wings or floors named in it, so check that your wing and floor are listed.
You should be very careful. Under the October 2026 circular, for a project that must be registered with MahaRERA, the sale document must carry the MahaRERA registration certificate or the OC, along with the sanctioned building plan showing the flat area. For projects outside MahaRERA, the circular asks for the building permission or CC, the sanctioned plan, a zone certificate and a measurement plan (Lokmat Times). Some experts have questioned whether an executive circular can override the registration law, so the position may still be tested. For a resale flat in a building with no OC, take an advocate's opinion before you pay any token amount.
An under-construction flat is always bought before the OC, because the OC is issued only when the building is finished. Here the protection is the MahaRERA registration, the CCs uploaded on the project page and the completion date in your registered agreement. Our ready-to-move vs under-construction guide compares both routes, including GST.
Large. According to a Hindustan Times report of 6 November 2026, around 12 lakh homeowners living in nearly 25,000 residential buildings in Mumbai lack an OC. BMC officials expect the current amnesty criteria to help around 5,000 housing societies, and the BMC had received 97 applications, only four with full documents, nearly two months after launch (Hindustan Times).
As reported by Hindustan Times, the scheme began on 9 September 2026 and covers buildings occupied before 17 November 2016 that hold a valid Intimation of Disapproval (IOD) and CC. Residential units larger than 80 sq m (861 sq ft) are excluded, an NOC from the original developer or applicant is needed, and the scheme does not regularise illegal construction. If you are buying a resale flat in an older society, ask whether the society has applied.
Keep the OC with the rest of your papers using our resale flat documents checklist, and plan your registration costs with our stamp duty guide for 2026 and the IGR Maharashtra portal.
If you prefer a new building, OM GN Willows at Kannamwar Nagar-1, Vikhroli East (MahaRERA P51800077593) offers 1 and 2 BHK homes from ₹78.50 L all-inclusive. It is under construction, so you can check its registration and CCs on MahaRERA today and ask for the OC at possession. For ready flats in Mulund and Vikhroli, browse our properties page, or read why Mulund and Vikhroli remain strong choices in 2026. If you are taking a loan, see our post on the repo rate and home loan EMIs.
Gita Real Estate is a MahaRERA-registered agent (A51800006506) with an office in Mulund West. We help with buying, selling and renting, and with stamp duty and registration. Before you book, we can go through the OC, CC and MahaRERA details of a flat with you, so you know exactly what you are buying. Call or WhatsApp +91 90821 79935 or +91 93239 85063, or reach us through our contact page.
An OC is the certificate issued by the local planning authority, such as the BMC in Mumbai, after it inspects a finished building and finds it built as per the approved plan and fit to be occupied. It is different from the Commencement Certificate (CC), which only permits construction to start.
It is risky. Under a Maharashtra revenue department circular of 12 October 2026, sub-registrars are told not to register flat sale or transfer documents unless the prescribed approvals are attached, such as the MahaRERA registration certificate or OC, and the sanctioned plan showing the flat area. Take advice from an advocate before you pay for any flat in a building without an OC.
Yes. An under-construction flat in a MahaRERA-registered project is booked before the OC, because the OC comes only when the building is complete. Check the MahaRERA registration, the CCs on the project page and the promised completion date, and ask for the OC before you take possession.
Under Section 19(10) of the RERA Act, as listed by MahaRERA, an allottee must take physical possession within two months of the occupancy certificate being issued.
The BMC opened an amnesty scheme on 9 September 2026 for eligible buildings occupied before 17 November 2016 that have a valid IOD and CC. Residential units larger than 80 sq m are excluded and it does not regularise illegal construction. Societies apply to the BMC through the prescribed process.